Natural stone interlocking tiles
Find your tile by SKU.
Explore available stone patterns, open a product for larger images, and include its SKU when you contact us.
Product collection
Loading products…
Installation guide
A level base makes the system work.
Use these tiles on a hard, flat, clean and well-drained surface. Dry-lay the first row before locking the connectors.
Download the printable guide- 1
Prepare the base
Remove grit, loose debris and standing water. Correct dips or rocking areas.
- 2
Dry-lay and mix
Blend natural colour variation and confirm the layout before connecting tiles.
- 3
Align connectors
Place the loop edge beside the tab edge. Keep both tiles flat and square.
- 4
Press to lock
Press directly above each connection until fully seated. Work row by row.
- 5
Trim and finish
Cut only the plastic base with appropriate snips. Use proper PPE for stone cutting.
Care
Sweep, rinse and use a pH-neutral stone cleaner.
Drainage
Keep the channels and the original drain path clear.
Safety
Wet stone may be slippery. Wear suitable protection when cutting.
Product enquiries
Start with the SKU.
Send the product code, required quantity and delivery destination. We will reply with availability and next steps.
Registered company 武汉年马慢贸易有限公司